|
|
|
|
|
|
Meeting Date:
|
6/21/2022 - 5:30 PM
|
Category:
|
BUSINESS SERVICES
|
Type:
|
Action
|
Subject:
|
8.2 Recommend Board Approval of Shade Structure Repairs at Colin Powell Preschool with USA Shade
|
Strategic Plan:
|
|
Enclosure
|
USA Shade CPPS Quote.pdf
|
File Attachment:
|
|
Summary:
|
A shade structure at Colin Powell Preschool suffered a catastrophic failure with the fabric. The tear is non-repairable, and the fabric needs to be replaced. The fabric survived its life expectancy of eight to ten years. USA Shade will replace the shade fabric with a new reinforced type fabric in the same color.
|
Funding:
|
Operations: $5700.80
|
Recommendation:
|
It is recommended that the Governing Board of Trustees approve the shade structure repairs at Colin Powell Preschool with USA Shade.
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Robert Saffel - Senior Director of Technology, Maintenance and Operations
|
|
Signed By:
|
|
Robin Schreiner - Senior Director, Business Services
|
|
Signed By:
|
|
Marc Lacey - Assistant Superintendent, Administrative Services
|
|
Signed By:
|
|
Jesse M. Najera - Superintendent
|
|
|
|
Vote Results:
|
Original Motion | Member Mark Staggs Moved, Member Lynn McKee seconded to approve the Original motion 'It is recommended that the Governing Board of Trustees approve the shade structure repairs at Colin Powell Preschool with USA Shade.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 4 Nay: 0. | The motion Carried 4 - 0 |
|
|
|
|
|
|