Agenda Item
Meeting Date:
6/21/2022 - 5:30 PM  
Category:
BUSINESS SERVICES  
Type:
Action  
Subject:
8.2 Recommend Board Approval of Shade Structure Repairs at Colin Powell Preschool with USA Shade  
Strategic Plan:
 
Policy:
 
Enclosure:
USA Shade CPPS Quote.pdf  
File Attachment:
USA Shade Proposal - Colin Powell Preschool Fabric Replacement 2022_05_23 10-27 (1).pdf
 
Summary:
A shade structure at Colin Powell Preschool suffered a catastrophic failure with the fabric. The tear is non-repairable, and the fabric needs to be replaced. The fabric survived its life expectancy of eight to ten years.

USA Shade will replace the shade fabric with a new reinforced type fabric in the same color.
 
Funding:
Operations: $5700.80  
Recommendation
It is recommended that the Governing Board of Trustees approve the shade structure repairs at Colin Powell Preschool with USA Shade.  
Approvals:
Recommended By:
Signed By:
Robert Saffel - Senior Director of Technology, Maintenance and Operations
Signed By:  
Robin Schreiner - Senior Director, Business Services
Signed By:  
Marc Lacey - Assistant Superintendent, Administrative Services
Signed By:  
Jesse M. Najera - Superintendent
 
Vote Results:

Original Motion
Member Mark Staggs Moved, Member Lynn McKee seconded to approve the Original motion 'It is recommended that the Governing Board of Trustees approve the shade structure repairs at Colin Powell Preschool with USA Shade.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 4 Nay: 0.
The motion Carried 4 - 0